Doc M installations
East Surrey Hospital
This particular project was built in 2 phases and all works, unusually for us, were carried out on site at The East Surrey Hospital. The first phase consisted of the ground floor being fitted out with HTM regulatory Doc M showers, Doc M toilet installations with medical basins all across the building. By the end of phase one, all component parts were up and running, chlorinated to BS6700 and ready for the hospital to use.
Phase 2 was a first floor addition to the ground floor and an exact copy of what had already been supplied and fitted in terms of Doc M shower room, Doc M toilet facilities and medical basins. Again all items were fitted out to HTM regulations and chlorinated to BS6700.
The hospital and our client were happy with the end result and we understand that there is a possibility of another two buildings in the pipeline at East Surrey Hospital, which would be good news for everyone at Lee Hood Plumbing & Heating Ltd.